# Optimize Self-Consumption -> Limit Discharge Power Initial State: `Optimize Self-Consumption` Target State: `Limit Discharge Power` ## Test Procedure 1. The system is brought to the `Optimize Self-Consumption` state by setting `Min SOC` lower than the current SOC. 2. `Grid setpoint` is set to 0W. 3. The `Limit Discharge Power` option is activated and the `Maximum Discharge Power` is set to 1000W. 4. A load of 2000W or more is connected to the system. ## Expected Outcome As soon as the load is connected, the battery state changes into the `Limit Discharge Power` state and discharges with a maximum power of 1000W(+/-50W). The rest of the load is supplied by the grid. ## Tested Outcome The systen reacted as expected.