Innovenergy_trunk/doc/controller_tests/ForcedEOC-OptimizeSelf-Cons...

1.2 KiB


# Forced EOC -> Optimize Self-Consumption (charging)

Initial State: Forced EOC
Target State: Optimize Self-Consumption

Test Procedure

  1. SOC should be 98% or below
  2. A production surplus is simulated by setting the Grid setpoint to a positive value: 2000W
  3. The system is brought to the Forced EOC state using Force charge now in the gui.
  4. Wait until the system changes to Optimize Self-Consumption

Expected Outcome

  • The system charges the battery to EOC in the Forced EOC state.
  • charging power decreases as SOC approaches 100%
  • the system changes into Optimize Self-Consumption
  • the system continues to charge with very low power <100W or discharges with very low power <100W
  • Time to forced full charge displayed on the gui is 6d 18h +-1h

Tested Outcome

The system reacted as expected and switched to Optimize Self-Consumption when the battery is fully charged and having
100% SOC. The system is continuously charging with a power of ~3W. Time to forced full charge is correctly displayed and
gets restarted or stays the same (6d 18h) as long as the battery is in charge mode.

Charge to mind SOC -> Optimize Self-Consumption