# Limit Charge Power -> Optimize Self-Consumption

Initial State: Limit Charge Power
Target State: Optimize Self-Consumption

Test Procedure

  1. Grid setpoint is set to 2500W.
  2. The system is brought to the Limit Charge Power by activating its option and the Maximum Charge Power is set to 1000W.
  3. A load of 2000W or more is connected to the system.

Expected Outcome

As soon as the load is connected, the battery state changes into the Optimize Self-Consumption state and charges with power of range (0W-1000W), depending
on the load power.

Tested Outcome

The systen reacted as expected.