# Disconnected Grid Meter
Initial State: Optimize Self-Consumption
Target State: Optimize Self-Consumption
Test Procedure
min SOC
is set to be at 5% or more below the currentSOC
Grid setpoint
is set to 500W.- a load (min 1000W) is connected to the AC-Out side of the inverter.
- The communications cable to the grid meter is disconnected to simulate a defect or missing grid meter
- the load is disconnected from AC out
- The communications cable to the grid meter is reconnected
Expected Outcome
- The system is initially in the
Optimize Self-Consumption
state - It consumes ~500W from the grid, the the remainig power required by the load is sourced from the battery.
- Once the grid-meter is disconnected, the inverter no longer consumes power from the grid, and feeds the load from the battery exclusively.
- When the load is disconnected, the inverter goes to an idle state, energy flow to/from battery and grid should drop to almost 0W.
- Once the grid-meter is reconnected, the system charges the battery with ~500W AC.