# Hold min SOC -> Optimize Self-Consumption

Initial State: Hold min SOC
Target State: Optimize Self-Consumption

Test Procedure

  1. Min SOC is set to slightly lower than the current SOC
  2. Min SOC should be 50% or lower
  3. Grid setpoint is set to a negative value -2000W
  4. Wait until the system reaches the Hold min SOC state and discharging power falls below 1500W
  5. Grid setpoint is set to a positive value: 2000W

Expected Outcome

The system first settles into the Hold min SOC state.
As soon as the Grid setpoint is set to positive, the system changes into the Optimize Self-Consumption and charges with ~2000W.

Tested Outcome

While the system was on Hold min SOC state sitting on around 46% SOC, the Grid setpoint was set to a 2000W, the system
started charging with a power of around 1600W until around 70% SOC, then it started throtteling the charging power.

Hold min SOC -> Optimize Self-Consumption